(06 May 2015, 4:58 pm)Malarkey Pretty sure that link you have posted shows an Image of a Versa along with an interpretation of what the Branding will look like, so therefore I dont think any New Buses will be coming for the revised Quaylink/X40, and will use however many Vehicles are required out of Versas 8310-8318 and 8328/29.
(06 May 2015, 4:58 pm)Malarkey Pretty sure that link you have posted shows an Image of a Versa along with an interpretation of what the Branding will look like, so therefore I dont think any New Buses will be coming for the revised Quaylink/X40, and will use however many Vehicles are required out of Versas 8310-8318 and 8328/29.
(06 May 2015, 2:05 pm)MrFozz I imagine a diversion would follow the 35 from Newbottle...Phily-Herrington Burn-Board Inn, swing into Doxford Int'l from there
(06 May 2015, 4:51 pm)Michael Millburngate Bridge, Durham, Lane closures - 10 May
Date: 06 May 2015
We have just been provided with short notice details of lane closures and works on Millburngate Bridge in Durham this coming Sunday.
Durham County Council will be carrying out investigation works on Milburngate Bridge and we are told to expect bus delays due to these works.
The work will take place on Sunday 10 and Sunday 17 May between 7am and 7pm.
Lane closures will be in place on the bridge between 4am and 9pm on the two days the work will be carried out.
Two lanes will remain open, allowing traffic to flow in both directions during the works.
We apologise for any inconvenience these works will cause, which are outside of our control.
(06 May 2015, 2:05 pm)MrFozz I imagine a diversion would follow the 35 from Newbottle...Phily-Herrington Burn-Board Inn, swing into Doxford Int'l from there
(06 May 2015, 4:51 pm)Michael Millburngate Bridge, Durham, Lane closures - 10 May
Date: 06 May 2015
We have just been provided with short notice details of lane closures and works on Millburngate Bridge in Durham this coming Sunday.
Durham County Council will be carrying out investigation works on Milburngate Bridge and we are told to expect bus delays due to these works.
The work will take place on Sunday 10 and Sunday 17 May between 7am and 7pm.
Lane closures will be in place on the bridge between 4am and 9pm on the two days the work will be carried out.
Two lanes will remain open, allowing traffic to flow in both directions during the works.
We apologise for any inconvenience these works will cause, which are outside of our control.
PB0002400/450 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted: Operating between Sunderland, Park Lane Interchange and Sunderland, Park Lane Interchange given service number 700/701 effective from 27-Jun-2015. To amend Timetable
(07 May 2015, 2:10 pm)Jimmi PB0002400/450 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted: Operating between Sunderland, Park Lane Interchange and Sunderland, Park Lane Interchange given service number 700/701 effective from 27-Jun-2015. To amend Timetable
(07 May 2015, 2:10 pm)Jimmi PB0002400/450 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted: Operating between Sunderland, Park Lane Interchange and Sunderland, Park Lane Interchange given service number 700/701 effective from 27-Jun-2015. To amend Timetable
Go North East service 238/239 timetable from 31/5/15:
(11 May 2015, 11:15 am)cbma06 Go North East service 238/239 timetable from 31/5/15:
(11 May 2015, 11:15 am)cbma06 Go North East service 238/239 timetable from 31/5/15:
(11 May 2015, 11:15 am)cbma06 Go North East service 238/239 timetable from 31/5/15:
(11 May 2015, 11:15 am)cbma06 Go North East service 238/239 timetable from 31/5/15:
The changes for the 20 due to the A690 being closed, starting on the 8th - were put online on the 7th.
The powers that be, need to keep an eye on the forum! It had been mentioned on here a while beforehand (several times), had been on the Council website for donkeys and had been displayed for at least a week prior, on the roadside on giant mobile LED displays.
At least they found out in the end.
http://www.simplygo.com/news/closures-of...rd-8th-may
(13 May 2015, 5:48 pm)Andreos1 The changes for the 20 due to the A690 being closed, starting on the 8th - were put online on the 7th.
The powers that be, need to keep an eye on the forum! It had been mentioned on here a while beforehand (several times), had been on the Council website for donkeys and had been displayed for at least a week prior, on the roadside on giant mobile LED displays.
At least they found out in the end.
http://www.simplygo.com/news/closures-of...rd-8th-may
(13 May 2015, 5:48 pm)Andreos1 The changes for the 20 due to the A690 being closed, starting on the 8th - were put online on the 7th.
The powers that be, need to keep an eye on the forum! It had been mentioned on here a while beforehand (several times), had been on the Council website for donkeys and had been displayed for at least a week prior, on the roadside on giant mobile LED displays.
At least they found out in the end.
http://www.simplygo.com/news/closures-of...rd-8th-may
Few more for the Sunderland Airshow today.
PB0002400/563 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted: Operating between DOWNHILL SPORTS COMPLEX and SEABURN PARK given service number PARK & RIDE 1 effective from 25-Jul-2015. To amend Timetable.
PB0002400/564 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted: Operating between FULWELL QUARRY and SEABURN PARK given service number PARK & RIDE 2 effective from 25-Jul-2015. To amend Timetable.
PB0002400/565 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Variation Accepted: Operating between MONKWEARMOUTH STADIUM OF LIGHT and ROKER HARBOUR VIEW/SEABURN PARK given service number PARK & RIDE 3 effective from 24-Jul-2015. To amend Timetable.
(12 May 2015, 10:33 am)Dan Changes to services from 31 May 2015
http://www.simplygo.com/news/changes-to-...1-may-2015
(12 May 2015, 10:33 am)Dan Changes to services from 31 May 2015
http://www.simplygo.com/news/changes-to-...1-may-2015
Just been looking at the Service Changes for the 4/82/82A from the 31st May, with Services additionally going to serve Follingsby Park, does this therefore mean that both Services will see a PVR Increase of 1 to therefore assist reliability etc.
Also a thought that I have just had for the Peak Time instead of the above.
921 - Newcastle Eldon Square - Newcastle Clayton Street - Gateshead Interchange - Heworth Metro - Follingsby Park - Washington Galleries - Rainton Bridge Express
Merging with Service 922 and replacing the revised 4/82/82A Workings as of 31st May 2015 and A-Line Service 994 at Follingsby Park.
Revised Timetable using the first Journey of the 921/922 of the Morning from Newcastle/Heworth to Rainton Bridge.
Newcastle Eldon Square 06:57 - Departing 8 Minutes Earlier than it currently does
Newcastle Clayton Street 07:03 - Operating 8 Minutes Earlier
Gateshead Interchange 07:09 - Operating 8 Minutes Earlier
Heworth Metro 07:17 - Picking Up the current 07:20 922 on wards to Rainton Bridge departing 3 Minutes Earlier
Follingsby Park 07:28 - Additionally Serving Follingsby Park bringing Improved Service Links
Washington Galleries 07:38 - Operating 4 Minutes Later than the current 07:34 922
Rainton Bridge Express 07:53 - Arriving 6 Minutes Later than the current 921 and 3 Minuter Later than the current 922
(17 May 2015, 1:21 pm)Malarkey Just been looking at the Service Changes for the 4/82/82A from the 31st May, with Services additionally going to serve Follingsby Park, does this therefore mean that both Services will see a PVR Increase of 1 to therefore assist reliability etc.
(17 May 2015, 1:21 pm)Malarkey Just been looking at the Service Changes for the 4/82/82A from the 31st May, with Services additionally going to serve Follingsby Park, does this therefore mean that both Services will see a PVR Increase of 1 to therefore assist reliability etc.