In all instances, the 'quality' weighting (for better features such as contactless payment methods, USB charging points, Wi-Fi and next stop audio-visual announcements) has been removed, in favour of more weighting towards cost.
These are:
- Service 8 (South Hylton - The Docks): 1 PVR daily (evenings and all day Sunday), Euro 5 vehicle with a minimum capacity of 23 - currently operated by Gateshead Central Taxis.
- Service 12 (South Shields - The Lonnen): 1 PVR daily (evenings only), Euro 5 vehicle with a minimum capacity of 23 - currently operated by Stagecoach North East.
- Service 79 (Hall Lane - Barnwell): 1 PVR Mon-Sat, Euro 5 vehicle with a minimum capacity of 36 - currently operated by JH Coaches.
- Service 79/79A (Barnwell - Easington Lane): 2 PVR (Mon-Sat evenings and all day Sunday), Euro 5 vehicle with a minimum capacity of 23 - currently operated by Go North East.
- Services 93/94 and 97 (Gateshead services): 4 PVR (Early morning and late evening journeys), Euro 5 vehicle with a minimum capacity of 36 - currently operated by Go North East.
- Services 135/136 (Downhill/Hylton Circular): 3 PVR (Early morning journeys), Euro 5 vehicle with a minimum capacity of 23 - currently operated by Go North East.
- Service 592 (Roker - Doxford International): 1 PVR weekdays only, Euro 5 vehicle with a minimum capacity of 23 - currently operated by Gateshead Central Taxis.
- Service 593 (Pallion - Doxford International): 1 PVR weekdays only, Euro 5 vehicle with a minimum capacity of 23 - currently operated by Gateshead Central Taxis.
It's quite disappointing to see that in this latest batch of tenders, neither of those are deemed important enough (with the same timetables from last year being used again, and the removal of incentive for operators to provide a better quality service).