(4 hours ago)Storx wrote Aye, sure there's lots of ideas you could come with really, bonus points if you can get rid of all the Venture services, I'd assume your 47A would replace the V5? I'm sure the people in Delves Lane would appreciate links further afield than Consett aswell, there's more than enough services terminating in Consett.
What about this:
1️⃣ 10A – Consett ⇄ Newcastle (All-Stops Core)
Route:
Consett → Shotley Bridge → Blackhill → Blackhall Mill → High Spen → Crawcrook → Ryton → Blaydon → Metrocentre → Newcastle
Extensions (alternating journeys):
Crookhall
Delves → Leadgate → Medomsley → The Dene
⏱ Frequency:
Every 15 minutes (base)
Each branch effectively:
Crookhall: every 30 mins
Medomsley/The Dene: every 30 mins
? Role:
Main coverage + connectivity route
Timed to connect with X45/X47 at Consett
2️⃣ X45 – Consett ⇄ Newcastle (Fast via Ebchester)
Route:
Consett → Blackhill → Shotley Bridge → Ebchester → Rowlands Gill → Swalwell → Metrocentre → Newcastle
⏱ Frequency:
Every 30 minutes (daytime)
Every 60 minutes (evening)
? Role:
Primary fast Derwent Valley corridor
Covers unique links (Ebchester, Swalwell)
3️⃣ X47 – Consett ⇄ Newcastle (Fast via Chopwell)
Route:
Consett → Shotley Bridge → Blackhall Mill → Chopwell → High Spen → Rowlands Gill → Metrocentre → Newcastle
⏱ Frequency:
Every 30 minutes (daytime)
Every 60 minutes (evening)
? Role:
Secondary express
Adds capacity + covers Chopwell
? Combined Corridor Frequency
? Consett ⇄ Metrocentre ⇄ Newcastle:
10A: every 15 mins
X45: every 30 mins
X47: every 30 mins
? Combined = every 7–8 minutes
? Example Even Headway Pattern
Minutes past hour Service
00 10A (Crookhall)
07 X45
15 10A (Medomsley)
22 X47
30 10A (Crookhall)
37 X45
45 10A (Medomsley)
52 X47
? Creates turn-up-and-go service on core corridor
? Evening / Sunday Simplification
To reduce cost but keep coverage:
10A → every 30 mins (still alternating branches)
X45 → every 60 mins
X47 withdrawn evenings (covered by 10A + X45)
? Keeps:
Simplicity
Coverage
Lower operating cost