RE: Tyne and Wear Metro - Washington Extension Project
(01 Sep 2026, 2:57 pm)Storx wrote Complete waste of this money in it's current form and I don't care what anyone says and everyone on SkyScraperCity is having similar views.
Unless there's a sudden influx of demand from Sunderland wanting to go to a few factories then this Washington South <> South Hylton is just a complete waste of money considering it now needs 5 roads bridges - one involving the A19 so it ain't a £10 job, land acquisition and it serves literally nothing en-route.
I know some will say but this but that, but I'll just leave this here - imagine how much you could spend on alternative transport ie. buses using the same money which actually serves people's doors since there's zero parking at the stations either; The Chester Road, Durham Road, Washington Road/North Hylton Road corridors, in particular.
Washington South <> Pelaw has more merit, but imo it should be national rail but that's another debate.
Ah, you've got me there! It must be true if it's on SkyScraperCity...
To take a few of the comments on there:
"In Washington itself I’m not convinced by the station locations, park and ride or provision for connecting public transport. They seem intent on serving 3 industrial estates as if commuter traffic will be inward not outward." - Washington North would benefit Nissan, yes, but Usworth and Sulgrave are two densely populated areas versus other parts of Washington. You have to remember that Sulgrave built upwards. There's also the land right next to the station site that has long been earmarked for housing. The 50/56 also stop right outside of it. Washington South is also serving Teal Farm, Columbia and Fatfield, though I agree the bus integration for this one needs to be better worked out. A location further along the line would have worked better for South imo, but you don't really have a lot of choice to deviate!
"No P&R plans for Washington South seem a big miss." - Why is it? I'd have liked to have seen one at Usworth, and indeed it was on an earlier plan that I saw, but realistically it's a 6 minute drive away from Follingsby, and most of Washington sits on that arterial road (the A195/Northumberland Way) to get there. Those parts that don't, e.g. Ayton and Blackfell and get there (via the A194) in about 2/3 minutes more than it'd take to get down to Swan/Barmston Court.
"This whole proposal is utterly ridiculous and the birth child of petty North East parochialism thats now going to waste a billion quid." - I'm surprised NEMSA spend money on professionals to come in and carry out technical, strategic and business assessments for them, when they could listen to people like this on SCC. What he may refer to as 'petty North East perochialism' is actually the North East getting a bite at the cherry for once. The North East overall receives the lowest transport investment to any other region by some margin:
https://commonslibrary.parliament.uk/res...2025-0170/
"Surely a Washington branch from Pelaw would have been a cheaper and easier start." - I understand the point, but I'd suggest it would significantly weaken the business case. Baring in mind the long-term aim is still to get the Leamside south open, so that Viaduct has to be tackled at some point. The link to Sunderland provides a massively improved access to jobs in the City, not to mention leisure and the night-time economy. It links up to everything Sunderland have been doing in and around Vaux, Sheepfolds, the Stadium and on to Seaburn. It also provides a really handy fall-back for trains not being blocked in the event of disruption.
"However without an A19 park and ride station I think this just hasn't been thought through" - I'm not sure Washington is the best place for an A19 park and ride station personally. I don't think people will travel to Washington to park their car, when they could just as easily use the existing long-stay at Heworth or the car park at Fellgate. Neither of which, I believe, are bursting at the seams?
"I think they’re using Leamside as an easy, populist option, but it skirts Washington‘s east side, and isn’t going to tempt people to use it with a 1-2 mile walk to get to a station…" - I tend to agree, but by the very nature of a railway, it can't operate on everyone's doorstep. The plan is for buses to be under public control by then, so I think it's a reasonable expectation that we'll see changes to the Washington mini bus network that links people up to a Metro station as part of an integrated solution. Washington also has excellent cycling access, given most of the new town was built with a network of subways. It's possible to travel to most parts without using a major road.
I think the points around the alignment along Cox Green needs some additional explanation, but I suspect it's to avoid having the Metro going right between two houses. The former station house and the build to the rear. Once you get the dual track in, there'd not be a lot of space for lineside equipment or OHL.