(27 Jul 2015, 5:47 pm)S813 FVK wrote That is what i gathered from the proposals too.
With all of this splitting, i can't help but think it has something to do with QCS. Won't be long before they are trying to do something with the 8/8A/78/78A.
The whole objective of the changes is to correct timing issues, and I wouldn't say the ''Coast & Country'' services really need to be time corrected. Almost all of the journeys I make on the services, which are very regular, arrive and depart on time. There are never really any catastrophic delays, like you'll find on the ''Diamond'' services every now and then.
Although, if some changes are made, I imagine the changes would be the following; both services are split at Chester-le-Street, with an 8 service between Stanley and Chester-le-Street, and Chester-le-Street and Sunderland, then the 78 between Consett and Chester-le-Street, then again from there to Sunderland.