You need to enable JavaScript to run this app.

Skip to main content

Go North East: Upcoming Service Changes

Go North East: Upcoming Service Changes

RE: Go North East: Upcoming Service Changes
Would be nice to see the short Coasters extended to Blyth during the summer via Ridley Park as a trial. Would make a canny bit and may only require an extra bus.
RE: Go North East: Upcoming Service Changes
(23 May 2016, 11:21 am)L469 YVK wrote Would be nice to see the short Coasters extended to Blyth during the summer via Ridley Park as a trial. Would make a canny bit and may only require an extra bus.

I think it should be 1A consider blyth have already 1 at blyth
4842
Best bus ever
RE: Go North East: Upcoming Service Changes
(24 May 2016, 5:44 am)biglugs@yahoo.com wrote I think it should be 1A consider blyth have already 1 at blyth

Metrocentre already had a 6 prior to October but GNE added another.
Go North East: Upcoming Service Changes
PB0002400/450 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Variation Accepted: Operating between Sunderland, Park Lane Interchange and Sunderland, Park Lane Interchange given service number 700/701 effective from 04-Sep-2016. To amend Timetable.

PB0002400/552 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Variation Accepted: Operating between DURHAM BUS STATION and SOUTH SHIELDS BUS STATION given service number 20/20A/X20 effective from 24-Jul-2016. To amend Timetable.

PB0002400/604 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Registration Accepted
Starting Point: Sunderland Park Lane Interchange
Finish Point: Seaburn Park
Via:
Service Number: A1
Service Type: Limited Stop
Effective Date: 22-JUL-2016
Other Details: Special service to run on Friday 22nd July, Saturday 23rd July and Sunday 24th July 2016 for the Sunderland International Air Show

PB0002400/605 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Registration Accepted
Starting Point: Washington Galleries Bus Station
Finish Point: Seaburn Park
Via:
Service Number: A2
Service Type: Limited Stop
Effective Date: 22-JUL-2016
Other Details: Special service to run on Friday 22nd July, Saturday 23rd July and Sunday 24th July 2016 for the Sunderland International Air Show
RE: Go North East: Upcoming Service Changes
Closure of Holmeside in Sunderland from 31 May

Date: 24 May 2016

Holmeside will be closed eastbound to all vehicles from Tuesday 31 May for approximately 16 weeks.

During this closure, all eastbound journeys will be diverted.

Services 9, 20/20A, 35/35A, 36, 56, 135, X20 and X36 towards Fawcett Street will divert via Stockton Road, Park Road and Burdon Road.
Services 2/2A, 33 and 39 will use the same diversion to Burdon Road, then right to Borough Road, to reach Toward Road.
Westbound journeys will operate on Holmeside normally during this time.
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
PB0002400/602 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Registration Accepted by SN
Starting Point: Newcastle Airport, Passenger Terminal
Finish Point: South Gosforth Metro, Church Avenue
Via:
Service Number: 900
Service Type: Limited Stop
Effective Date: 26-JUN-2016
Other Details: Metro replacement, to run on 26th June 2016 only

PB0002400/603 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA
Registration Accepted by SN
Starting Point: Heworth Interchange
Finish Point: South Hylton Metro
Via:
Service Number: 901
Service Type: Limited Stop
Effective Date: 12-JUN-2016
Other Details: Metro replacement, to run on 12th June 2016 only
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
(24 May 2016, 9:06 am)Jimmi wrote PB0002400/450 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Variation Accepted: Operating between Sunderland, Park Lane Interchange and Sunderland, Park Lane Interchange given service number 700/701 effective from 04-Sep-2016. To amend Timetable.

PB0002400/552 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Variation Accepted: Operating between DURHAM BUS STATION and SOUTH SHIELDS BUS STATION given service number 20/20A/X20 effective from 24-Jul-2016. To amend Timetable.

PB0002400/604 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Registration Accepted
Starting Point: Sunderland Park Lane Interchange
Finish Point: Seaburn Park
Via:
Service Number: A1
Service Type: Limited Stop
Effective Date: 22-JUL-2016
Other Details: Special service to run on Friday 22nd July, Saturday 23rd July and Sunday 24th July 2016 for the Sunderland International Air Show

PB0002400/605 - GO NORTHERN LTD T/A GO NORTH EAST, 117 QUEEN STREET, GATESHEAD, NE8 2UA

Registration Accepted
Starting Point: Washington Galleries Bus Station
Finish Point: Seaburn Park
Via:
Service Number: A2
Service Type: Limited Stop
Effective Date: 22-JUL-2016
Other Details: Special service to run on Friday 22nd July, Saturday 23rd July and Sunday 24th July 2016 for the Sunderland International Air Show

Nice to see the a2 run on a Friday
4842
Best bus ever
RE: Go North East: Upcoming Service Changes
(24 May 2016, 3:59 pm)biglugs@yahoo.com wrote Nice to see the a2 run on a Friday

Be weird not seeing the 99 run at this airshow this year
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
(24 May 2016, 5:44 am)biglugs@yahoo.com wrote I think it should be 1A consider blyth have already 1 at blyth

You're right there mind.

Imagine a passenger getting on intending to go to Bedlington Stn / Ashington and ending up in Gateshead?
RE: Go North East: Upcoming Service Changes
(24 May 2016, 4:39 pm)L469 YVK wrote You're right there mind.

Imagine a passenger getting on intending to go to Bedlington Stn / Ashington and ending up in Gateshead?

Agree with this!

Arriva also allocate Go North East to their own stand in Blyth Bus Station. It's right next to the stand for the 1 to Widdrington...!
RE: Go North East: Upcoming Service Changes
Closure of Hexham Rail Bridge from 6 June for up to 6 weeks

Date: 27 May 2016

From Monday 6 June, Network Rail is closing Hexham Rail Bridge for up to 6 weeks.

During this time, bus services that use the bridge will be diverted via the A69 and Two Mile Cottage.

Unfortunately, as this route is longer, most buses will depart from Hexham a few minutes earlier and arrive a few minutes later

Hexham rail-bridge temporary timetables- http://www.simplygo.com/download/publica...imetables/


-----------------

Closure of Cabin Gate in Bishop Auckland from 31 May

Date: 27 May 2016

Cabin Gate will be resurfaced from Tuesday 31 for the following 6 days.

Service 18 will, for the first 3 days, divert via The Aclet and Abbey Road to reach Proudfoot Drive, returning to Watling Road via The Aclet, as the right turn and left out of Woodhouse Lane will be suspended. For the remaining 3 days, Service 18 will be able to operate normal route as the suspended turning movements will be reinstated.

Please expect delays at Cabin Gate junction for the duration of works, as this junction will be covered by temporary single phase traffic signals.
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
Noticed on the facebook page after a complaint about the 17. It looks like they are extending it to Newcastle so maybe there will be changes to the 1 too? Hope not! But looks like changes are definitely happening now.

''Rumour has it there are service changes to this route from July 2016 with a driver saying to one customer that it is going to run to Newcastle...... heaven help us the service cannot run from Cramlington / Benton Asda on time!!!''
RE: Go North East: Upcoming Service Changes
(27 May 2016, 6:22 pm)Tom wrote Noticed on the facebook page after a complaint about the 17. It looks like they are extending it to Newcastle so maybe there will be changes to the 1 too? Hope not! But looks like changes are definitely happening now.

''Rumour has it there are service changes to this route from July 2016 with a driver saying to one customer that it is going to run to Newcastle...... heaven help us the service cannot run from Cramlington / Benton Asda on time!!!''

I just about to post it haha 


Interesting if they do decide to extend the 17 to Newcastle, not sure of the area, so no idea what route it would take!
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
(27 May 2016, 6:24 pm)Michael wrote I just about to post it haha 


Interesting if they do decide to extend the 17 to Newcastle, not sure of the area, so no idea what route it would take!

God knows I have heard that many different stories now we'll just have to wait and see Smile


I could understand splitting the route and having the 17 going Whitley Bay to Metrocentre and another route going Churchill Street to Cramlington but no idea why they would want it to go to Newcastle when the 1 goes frequently enough 

Problem is they want smaller buses around Holy Cross so that wouldn't work either unless they got Solos from somewhere.
RE: Go North East: Upcoming Service Changes
Saw another thing about something happening to the 11 come July. Is it just rumours or could something actually be in the pipeline?
RE: Go North East: Upcoming Service Changes
(31 May 2016, 3:47 pm)L469 YVK wrote Saw another thing about something happening to the 11 come July. Is it just rumours or could something actually be in the pipeline?

Not sure, nothing on VOSA yet, today its all First and Yorkshire Tiger.
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
(31 May 2016, 3:47 pm)L469 YVK wrote Saw another thing about something happening to the 11 come July. Is it just rumours or could something actually be in the pipeline?

I've heard it's to be withdrawn and possibly replaced with something more cost-effective. The Greenside-Blackhall Mill section of the route is secured by NEXUS.
RE: Go North East: Upcoming Service Changes
(31 May 2016, 3:55 pm)streetlite5402 wrote I've heard it's to be withdrawn and possibly replaced with something more cost-effective. The Greenside-Blackhall Mill section of the route is secured by NEXUS.

I didn't know that section was secured, always thought it was funded by GNE.

Wonder what could replace the 11 then.
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
(31 May 2016, 4:03 pm)Michael wrote I didn't know that section was secured, always thought it was funded by GNE.

Wonder what could replace the 11 then.

One of the R buses maybe?
RE: Go North East: Upcoming Service Changes
(31 May 2016, 4:03 pm)Michael wrote I didn't know that section was secured, always thought it was funded by GNE.

Wonder what could replace the 11 then.

I could be wrong, but I've been told it's NEXUS-secured. I reckon an extension of either the 10A/10B might replace it.
RE: Go North East: Upcoming Service Changes
(31 May 2016, 4:06 pm)streetlite5402 wrote I could be wrong, but I've been told it's NEXUS-secured. I reckon an extension of either the 10A/10B might replace it.

If that happens it will be the 10A, The 10B goes to Prudhoe which is the other direction.
My New Flickr https://www.flickr.com/photos/140662069@N02/ - Posts every Weekend at the minimum Smile
RE: Go North East: Upcoming Service Changes
(31 May 2016, 4:06 pm)streetlite5402 wrote I could be wrong, but I've been told it's NEXUS-secured. I reckon an extension of either the 10A/10B might replace it.

I'm not sure either, Dan or Citaro could confirm?
Ooo Friend, Bus Friend.
Site Administrator
RE: Go North East: Upcoming Service Changes
(31 May 2016, 4:10 pm)Michael wrote I'm not sure either, Dan or Citaro could confirm?

The Newcastle - Greenside Pack Horse section is commercially operated, while the Greenside Pack Horse - Blackhall Mill section is secured by Nexus.
RE: Go North East: Upcoming Service Changes
(31 May 2016, 4:17 pm)Dan wrote The Newcastle - Greenside Pack Horse section is commercially operated, while the Greenside Pack Horse - Blackhall Mill section is secured by Nexus.

Thanks Dan.
Ooo Friend, Bus Friend.
RE: Go North East: Upcoming Service Changes
Old style symbols on timetables saying which journeys are funded would be a good idea!