(06 Apr 2020, 12:32 pm)Rapidsnap wrote [ -> ]I would expect the remaining NatEx coaches to be put into reserve with NatEx stopping all services as of last night.

Wonder where they would get parked?, they don't normally have all the coaches in at the same time Tongue.
(06 Apr 2020, 11:50 am)Wybus wrote [ -> ]I wonder if more buses will be going into hibernation, as from my calculations the PVR has dropped by another 11 buses

4/X20, 5, 11, 19, 309/310, X1 - all minus 1
81-86 - minus 2
Hexham services - minus 3

I'm interested to see what changes are happening at Gateshead, Sunderland and Chester-le-Street from Saturday 11th April.


Does anyone know how many buses are in service at the minute, after the above changes to the 5 etc.
(06 Apr 2020, 11:50 am)Wybus wrote [ -> ]I wonder if more buses will be going into hibernation, as from my calculations the PVR has dropped by another 11 buses

4/X20, 5, 11, 19, 309/310, X1 - all minus 1
81-86 - minus 2
Hexham services - minus 3

The PVR reduced by a further 15 vehicles last Saturday (5 at Riverside, 3 at Hexham, 7 at Deptford). The closure of the Rainton Bridge offices, and a few more scholars services not being required, resulted in a couple more that you wouldn't have picked up on.

The final remaining coach on the National Express network is now no longer required too, as of yesterday. This means that the three remaining coaches at Deptford are surplus to requirements. The mothballed National Express coaches are predominantly parked up at Saltmeadows Road, although there are also two at Hexham and a handful at Volvo Washington.

The PVR reductions at the weekend have indeed resulted in more buses being parked up (but not fully delicensed yet):

Deptford
  • Volvo B9TL 6043, 6044, 6054, 6055
  • Optare Solo 680, 681, 682
  • Volvo B11RT 7145, 7146, 7147

Hexham
  • Optare Solo 677, 721, 723

Riverside
  • Volvo B9TL 6115, 6116
  • Optare Solo 628, 651, 724
(06 Apr 2020, 2:00 pm)Michael wrote [ -> ]Does anyone know how many buses are in service at the minute, after the above changes to the 5 etc.

Currently 236, but:
  • two Solos at Consett are only used on staff shuttles
  • one Solo at Deptford is only used on staff shuttles
  • four Streetlites at Deptford are only used on rail replacements on behalf of Northern, acquired at short notice last week.
Thanks for the updates Dan.

What section is the rail replacements for Northern?
(06 Apr 2020, 7:15 pm)Michael wrote [ -> ]Thanks for the updates Dan.

What section is the rail replacements for Northern?

ECML, Chathill to Newcastle.
(06 Apr 2020, 10:40 pm)deanmachine wrote [ -> ]ECML, Chathill to Newcastle.

Thank you.
More changes to GNE buses from the 11th April - Changes from Saturday 11 April
From Saturday 11 April, in line with the patterns of use we are now seeing, there will be some changes to services 2, 6, 10, 10A, 20, 21, 23, 25, 26, 27, 28, 28B, 29, 30, 33A, 34A, 38, 45, 49, 67, 69, 78, 448 (St Roberts School), 700, 702, M6, Q1, Q2, V1, V5, V9, X5, X10, X21, X30 and X71, with existing journeys for key workers maintained.


https://www.gonortheast.co.uk/coronavirus/
(07 Apr 2020, 3:06 pm)Michael wrote [ -> ]More changes to GNE buses from the 11th April - Changes from Saturday 11 April
From Saturday 11 April, in line with the patterns of use we are now seeing, there will be some changes to services 2, 6, 10, 10A, 20, 21, 23, 25, 26, 27, 28, 28B, 29, 30, 33A, 34A, 38, 45, 49, 67, 69, 78, 448 (St Roberts School), 700, 702, M6, Q1, Q2, V1, V5, V9, X5, X10, X21, X30 and X71, with existing journeys for key workers maintained.


https://www.gonortheast.co.uk/coronavirus/

I've had a look, and the main changes seem to be

2 - journey time sped up so no longer had lots of layover at Vicarage Estate
20 - South Shields to Sunderland part reduced from every 30 mins to hourly
23N - reduced from a 2 bus every 30/60 mins service to every 90 mins full route
25 - reduced from hourly to every 2 hours
28 - reduced from hourly to every 2 hours
29 - withdrawn
30 - reduced from hourly to every 2 hours
33 - now only runs Sunderland to Docks not to Vicarage Estate
38C - now runs as a 38
700/702 - both reduced from every 30 mins to hourly each
Q1/Q2 - no longer runs Gateshead to Newcastle via Quayside
V1 - withdrawn
V5 - withdrawn
V9 - withdrawn
X5 - Lanchester to Durham section reduced from hourly to every 2 hours
X10 - reduced from hourly to every 190 minutes
X21 - now only runs Bishop Auckland to Durham continuing as a 21 to Newcastle
X30 - Consett to Stanley section withdrawn
6 also reduced to every 2 hours, X71 diverted to The Dene replacing V5.
about time the 29 was withdrawn. running 6 minutes after the 28b since the original changes were made
(07 Apr 2020, 3:31 pm)Wybus wrote [ -> ]I've had a look, and the main changes seem to be

2 - journey time sped up so no longer had lots of layover at Vicarage Estate
20 - South Shields to Sunderland part reduced from every 30 mins to hourly
23N - reduced from a 2 bus every 30/60 mins service to every 90 mins full route
25 - reduced from hourly to every 2 hours
28 - reduced from hourly to every 2 hours
29 - withdrawn
30 - reduced from hourly to every 2 hours
33 - now only runs Sunderland to Docks not to Vicarage Estate
38C - now runs as a 38
700/702 - both reduced from every 30 mins to hourly each
Q1/Q2 - no longer runs Gateshead to Newcastle via Quayside
V1 - withdrawn
V5 - withdrawn
V9 - withdrawn
X5 - Lanchester to Durham section reduced from hourly to every 2 hours
X10 - reduced from hourly to every 190 minutes
X21 - now only runs Bishop Auckland to Durham continuing as a 21 to Newcastle
X30 - Consett to Stanley section withdrawn


I worked out, 18 less buses will be needed from this set of changes.

2 – 2 PVR - same PVR
6 – 1 PVR – minus 2 PVR
20 – 5 PVR -  minus 1 PVR
23 – 1 PVR – minus 1
25 – 2 PVR – minus 1
28/28B – 2 PVR – minus 1
29 – Minus 1 PVR
30 – 1 PVR – Same PVR
33 – 1 PVR – Same PVR
38 – 1 PVR – Same pvr
700/702 – 2 PVR – minus 1 PVR
Q1/Q2 – 2 PVR – minus 3 PVR
V1/V2/V9 – minus 2 PVR
X5 – 2 PVR – Same PVR
X10 – 1 PVR minus 3 PVR
X21 – 1 PVR minus 2 PVR
X30 – 2 PVR – same PVR
X71 2 PVR – Same PVR



So from Saturday, 33 less buses will be on the road (that includes last Saturday)
(07 Apr 2020, 4:30 pm)Michael wrote [ -> ]I worked out, 18 less buses will be needed from this set of changes.

2 – 2 PVR - same PVR
6 – 1 PVR – minus 2 PVR
20 – 5 PVR -  minus 1 PVR
23 – 1 PVR – minus 1
25 – 2 PVR – minus 1
28/28B – 2 PVR – minus 1
29 – Minus 1 PVR
30 – 1 PVR – Same PVR
33 – 1 PVR – Same PVR
38 – 1 PVR – Same pvr
700/702 – 2 PVR – minus 1 PVR
Q1/Q2 – 2 PVR – minus 3 PVR
V1/V2/V9 – minus 2 PVR
X5 – 2 PVR – Same PVR
X10 – 1 PVR minus 3 PVR
X21 – 1 PVR minus 2 PVR
X30 – 2 PVR – same PVR
X71 2 PVR – Same PVR



So from Saturday, 33 less buses will be on the road (that includes last Saturday)
Thanks for that information and working out Michael friend.. Your friendly friend.
I think it’s far more complex than that. The 30 looks to interwork with the X5, the 25 with the 28/28B.

The Consett and Stanley services look like they will be interworking as well as does the M6 at the Metrocentre, possibly with the 67?

The 2 reduces from 3 buses to 2 buses
(07 Apr 2020, 4:35 pm)Wybus wrote [ -> ]I think it’s far more complex than that. The 30 looks to interwork with the X5, the 25 with the 28/28B.

The Consett and Stanley services look like they will be interworking as well as does the M6 at the Metrocentre, possibly with the 67?

The 2 reduces from 3 buses to 2 buses

Ah never thought of that, probables will be, so could be even more buses off the road then.
(07 Apr 2020, 4:35 pm)Wybus wrote [ -> ]I think it’s far more complex than that. The 30 looks to interwork with the X5, the 25 with the 28/28B.

The Consett and Stanley services look like they will be interworking as well as does the M6 at the Metrocentre, possibly with the 67?

The 2 reduces from 3 buses to 2 buses
Definitely looks like 30 will interwork with X5 at Lanchester, M6 with 67 at MetroCentre and 6 with 10A at Eldon Square. 25, 28 and 28B might also interwork with 34A at Chester-le-Street.

In Sunderland 33A and 38 also interwork. Not surprised about frequency cut for 20 at Shields end.

21 interworks with 14 and X21 on opposite half-hours with a PVR of 7.
(07 Apr 2020, 7:09 pm)missedbus wrote [ -> ]Definitely looks like 30 will interwork with X5 at Lanchester, M6 with 67 at MetroCentre and 6 with 10A at Eldon Square. 25, 28 and 28B might also interwork with 34A at Chester-le-Street.

In Sunderland 33A and 38 also interwork. Not surprised about frequency cut for 20 at Shields end.

21 interworks with 14 and X21 on opposite half-hours with a PVR of 7.

I believe the 34A is Deptford's side, not ours.
looking on bustimes.org, it looks like the 34's are interworking with 28's with Coast and Country Streetlites, hence why all the 34's are all split in Chester le Street.
(08 Apr 2020, 8:27 am)Wybus wrote [ -> ]looking on bustimes.org, it looks like the 34's are interworking with 28's with Coast and Country Streetlites, hence why all the 34's are all split in Chester le Street.



Correct, from Riverside.


Sent from my iPhone using Tapatalk
(08 Apr 2020, 6:24 pm)Dan wrote [ -> ]Correct, from Riverside.


Sent from my iPhone using Tapatalk

Thanks for confirming it, how many buses does the interworking take out of service, as i had 33 (that includes last Saturday changes), so that's gonna increase now.

Any idea what buses will be took off the road?
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28